The costing model will result in a 28.5% reduction in travel cost and an overall saving of 5.4% on our maintenance bill.
Reference story | Retail | Costing Model
More content
Food and beverage | Downtime reduction
Due to the implementation of the level sensor we can see that the OEE started…
Client Reference | Manufacturing | Mechanical Condition Assessment | High Volume Printing
A specialised printing entity providing services to government stakeholders realised the need for reliability improvement…
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
The reticulation network at a local municipality has more than 600 pump stations across the…
Case Study | Oil and Gas | Retail Sites | FI Generator | Life Cycle Management
Assets or components removed from revamped sites are often still fully functional. We are pleased…
Case Study | Manufacturing | Packaging | Work Planning and Control Implementation and Support
Pragma developed a detailed standards manual, including among others: standards for JDE Plant Maintenance configuration…
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…
Reference story | Automotive | Criticality Analysis
Our client now has better insight into the criticality of their equipment and technologies, to…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Local Government | Municipality | Fleet Management Service
Our client is a metropolitan municipality in Southern Africa with a Fleet Management and Maintenance…