The costing model will result in a 28.5% reduction in travel cost and an overall saving of 5.4% on our maintenance bill.
Reference story | Retail | Costing Model
More content
Quarries | EAM system optimisation
PPC’s and Pragma Africa’s new partnership promises to take Strategy Management and Asset Care to…
Case Study | Local Government | Metropolitan Municipality | Work Planning and Control on SAP Mobile App
Work Planning and Control managed by the Asset Care Centre (ACC) at a local municipality…
Client Reference | Manufacturing | Automotive | Focused Improvement
The process we followed was excellent. It helped us identify problems and potential root causes…
Client Reference | Local Government | Municipality | Water | Asset Care Plans at Pump Stations
Engineering is the maintenance division of The Water Department, tasked to ensure that the facilities…
Case Study | Power | Renewable Energy | Globeleq | Consulting
The AM framework and associated products are providing GSAMS, as a young business in a…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Municipality | Training
The training helped me greatly with the implementation of the asset management improvement project in…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel…