The ACC provided a platform for the staff at ESS to be able to easily detect priority work, work that was falling behind and the status of any job at any time.
Municipality | Sub-station maintenance
More content
Case Study | Oil and Gas Retail | Shell | Welcome to Shell Toilet Upgrade Savings
Shell is well known as one of the five major national suppliers of petroleum products.…
Client Reference | Manufacturing Automative | FI on Light Curtains
Analysing data on production stoppages with the assistance of a highly motivated cross functional team,…
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Client Reference Story | Local Government Municipality | Generator On-Line Dashboard User Guide
In this case study, we illustrate how our Asset Health Management for Generators solution assists…
Case Study | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | Mining and Minerals | Coal | Exxaro | Operations Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…
Case Study | Oil and Gas Retail | Shell | HSSE Logger
We now remember to look out for potential incidents on site as we can log…