Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow us to continuously or periodically monitor and diagnose in order to forecast component degradation so that as needed, planned maintenance can be performed prior to equipment failure”
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
More content
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Chicken processing equipment | After sales
For Meyn, it is important to have a trustworthy single view on our Installed Base…
Case Study | Oil and Gas Retail | Shell | HSSE Logger
We now remember to look out for potential incidents on site as we can log…
Case Study | Oil and Gas Retail | Shell | Passport Training
Shell is well known as one of the major national suppliers of petroleum products. Shell…
Client Reference | Distributed Facilities | Retail | SLA driven performance
Our client is a large supermarket retailer in Africa, operating over 2,500 outlets under 15…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
Case Study | Manufacturing Glass | Nampak Glass | FI on IS Machine Maintenance Strategy
This project forms an integral part of the bigger asset management process by highlighting specific…
Case Study | Local Government | Metropolitan Municipality | Work Planning and Control on SAP Mobile App
Work Planning and Control managed by the Asset Care Centre (ACC) at a local municipality…