Focused interventions do not necessarily always have to lead to complex solutions where redesign or process changes are required. Maintaining the operational environment and the asset maintenance requirements and best practices are the ‘low-hanging fruits’ that can easily be rectified resulting in the designed performance of the asset.
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
More content
Case Study | Distributed Facilities | Office Management | Curo Fund Services | Contractor Management and Work Processes
This is how we reduced our client’s printing paper usage by 25% and reduced their…
Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Manufacturing | Real-time condition based monitoring using IIoT
The real-time condition monitoring project brought health measures of critical assets within the client’s plant…
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
Our client is a leading automotive manufacturer in South Africa. The client embarked on a…
Case Study | Mining | Manganese | Embedded Email Reports
MMC noticed that their personnel use their mobile phones extensively to access their daily reports.…
Client Reference | Manufacturing Bottling | Global Beverage Producer: Using Lifecycle Costing for Financial Decision-making
Our client is a global producer of beverages. They package various products on various lines…
Case Study | Oil and Gas | Retail | Sasol | Focused Improvement Dashboard
Pragma developed a dashboard to track improvement projects and highlight the combined costs of several…
Case Study | Productie Voedingsindustrie | C&D Foods | On-Key-implementatie
Pragma ondersteunt het onderhoudsprogramma On-Key van C&D en stelt het management in staat beter inzicht…
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel…
Client Reference | Manufacturing | Automotive | Asset Care Development Strategy Implementation
The asset care development plan was successfully implemented and achieved a maturity level of >71%…