Loading...
Skip to content

Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment

By doing proper analysis of all EC Tools per station it could be
determined which equipment failed the most and which tools were the
high cost drivers. By investing in a small change in design of the tool
payback was in two months compared to the costs of that tool over a
year. The project was a success and saved a lot of downtime, resulting in more units being built.


    Service providers
    Register here.

    Find a job
    Register here.

    How did you hear about us?
    Social media
    Word of mouth