The client is an Original Equipment Manufacturer (OEM) that offers maintenance contracts to their customers. Some of these contracts require the client to take responsibility for the maintenance of third party equipment (3PE) that forms part of the full line of equipment.
Client Reference | Food and Beverage Packaging | Asset Care Plan Development
More content
Client Reference | Facilities in Retail | Reducing Compressor Failures | Condenser fan services and voltage protectors
Our client is a large supermarket retailer in Africa with 35 million customers shopping at…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Client Reference | Distributed Facilities | Retail | Contract and Contractor Management | On Key
Improving contractor control and rates could result in a potential saving of more than 10%…
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Municipality | Fleet Management on SAP® PM
Improved Water and Sanitation Fleet Services management results in improved vehicle availability and reliability.
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
It was a big help to get all the maintenance recommendations from the different equipment…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…