The new Belfast mine is a high value-add coal project in the Mpumalanga region, with an expected Life of Mine (LOM) of 17 years for the first phase and it presents an excellent opportunity to grow the coal business. The proper management and maintenance of assets on a newly commissioned plant can immediately fall behind if not planned properly.
Case Study | Mining and Minerals | Coal | Exxaro | Operations Readiness Project
More content
Case Study | Manufacturing | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Diamonds | Cascade conveyors
Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to…
Case Study | Oil and Gas Retail | Shell | HSSE Logger
We now remember to look out for potential incidents on site as we can log…
Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Reference story | Airports | Accurate asset register
Our client gained control of their assets and now know what assets they have, their…
Case Study | Oil and Gas | Retail Sites | FI Generator | Life Cycle Management
Assets or components removed from revamped sites are often still fully functional. We are pleased…
Case Study | Mining | Manganese | Embedded Email Reports
MMC noticed that their personnel use their mobile phones extensively to access their daily reports.…
Case Study | OEM | MacAdams | AMIP
Without Pragma’s involvement, we would only have been able to come up with 10% of…