Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure that the installation, offline test and online assessment standards are met and will avoid incorrect replacement that can be costly.
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
More content
Client Reference | Manufacturing | Automotive | Implementing the Pragma Way
At our company our goal is to align people’s ambitions to plant strategy, ensuring that…
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Reference Story | OEM Packaging | Cancelled Replaced Spares using a SAP and On Key Interface
Complex interfaces between systems were removed that eased the management of large numbers of spare…
Client Reference | Mining | Coal | Compliance Dashboard
Our client consists of 4 mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Client Reference | Mining Coal | FI on LDV Maintenance Costs
This focused intervention will help me to have more control over my costs and to…
Client Reference | Mining and Minerals Nickel | Reliability Engineering and Training FI
A multi-faceted approach involving facilitated, on-site training courses plus an on-site reliability engineering service, supplemented…
Case Study | Manufacturing | Packaging | Work Planning and Control Implementation and Support
Pragma developed a detailed standards manual, including among others: standards for JDE Plant Maintenance configuration…