The primary crusher blocked on oversize material and suffered a breakdown that delayed production for over 24hrs. Engineers reviewed and intensified the maintenance strategy for the crusher based the crushing rate and workload.
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
More content
Client Reference | Mining and Minerals | Platinum | Reliability Block Diagrams
The client has the opportunity to test various scenarios concerning maintenance interventions, allowing them to…
Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Case Study | Local Government | Breede Valley Municipality | Integrated CMMS and Systems
BreedeValley Municipality is a local municipality located within the Cape Winelands District Municipality. The Electro-Technical…
Coal | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Case Study | Manufacturing FoodBev | C&D Foods | OK Implementation
Pragma allows analysis of maintenance spends per asset, real-time inventory management and fast reporting capability.…
Reference story | Supermarket / Retail Sector Contractor Management
Our client is one of the largest supermarket retailers in Africa, operating from more than…
Case Study | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | Retail | Massmart | Making informed decisions, increasing efficiency and saving costs
Massmart is a South African based globally competitive regional management group, invested in a portfolio…
Food and beverage | Downtime reduction
Due to the implementation of the level sensor we can see that the OEE started…
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
