Our client is a leading automotive manufacturer in South Africa. The client embarked on a journey to implement an asset management system based on the Pragma Way. One part of that system is Focused Improvement and structured problem-solving
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
More content
Case Study | Mining | Manganese | Embedded Email Reports
MMC noticed that their personnel use their mobile phones extensively to access their daily reports.…
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel…
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
The reticulation network at a local municipality has more than 600 pump stations across the…
Case Study | Distributed Facilities | Office Management | Curo Fund Services | Contractor Management and Work Processes
This is how we reduced our client’s printing paper usage by 25% and reduced their…
Case Study | Oil and Gas | Retail Sites | FI Generator | Life Cycle Management
Assets or components removed from revamped sites are often still fully functional. We are pleased…
Reference story | Health Care | Downtime reduction
Inspection preventive maintenance compliance as per legal and safety standards.
Client Reference | Engineering Services | Client Support Dashboard and Notification
Our client develops, maintains and monitors integrations between various source systems on behalf of their…
Client Reference | Mining | Coal | Compliance Dashboard
Our client consists of 4 mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Client Reference | Local Government | Metropolitan Municipality | Fleet Management | Optimisting Fuel Consumption
The Pragma Asset Care Centre and the client’s management team focused on and developed areas…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…