Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow us to continuously or periodically monitor and diagnose in order to forecast component degradation so that as needed, planned maintenance can be performed prior to equipment failure”
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
More content
Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment
Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was…
Chicken processing equipment | After sales
For Meyn, it is important to have a trustworthy single view on our Installed Base…
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel…
Client Reference | Mining | Coal | Conversion of TMM Maintenance Plans
Our client is a respected open cast coal mining and processing plant situated in the…
Client Reference | Local Government | District Municipality | Water | AMIP
Our client is a typical district municipality (DM) in a rural area of South Africa.…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Case Study | Manufacturing | FoodBev | Libstar | Asset Care Academy
The intent was to create a common understanding of maintenance management among all plant engineers…
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
The reticulation network at a local municipality has more than 600 pump stations across the…
Client Reference | Manufacturing | Automotive | Integrating the Pragma Way
The client gained improved asset management maturity with individuals taking ownership and accountability for completing…