Having control over planned and calculated (predictable) replacements of your assets will reduce lost production time caused by unnecessary breakdown repairs and will also reduce maintenance costs.
Client Reference | Mining Coal | FI on Pump Maintenance Strategy
More content
Client Reference | OEM Packaging | Driving efficiency and standardisation in global maintenance with On Key Plus
The Pragma team supports our client’s global network, consisting of over 8,000 filling machines, nearly…
Client Reference | Mining | Coal | Continuous Miner Utilisation
Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Client Reference | Oil and Gas | Natural Gas Reticulation | Boiler Reliability Assessment and Maintenance Plans
Our client identified a problem with reduced operational availability of gas-fired boilers at several provincial…
Client Reference | Facilities | Commercial Property | Pragma Service Request App
On Key Action provided a service request app that did away with system complexities and…
Client Reference | Oil and Gas | Commercial Depots Failure Mode and Effects Analysis
By defining and documenting failure modes across 32 asset types, the client achieved a structured…
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Client Reference | Manufacturing Automotive | Rotable Spares
The new rotable process is well integrated within all shops at our client. An increase…
Client Reference | Local Government | Municipality | Water | Asset Care Plans at Pump Stations
Engineering is the maintenance division of The Water Department, tasked to ensure that the facilities…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Distribution Facilities | Retail | Pepkor
50% decrease in turn around time to complete work orders Accurate and up to date…
