Pragma’s intervention has led to an increase in the number of units completed per day and a decrease in the labour cost per unit. This results in an improvement in workshop productivity/efficiency and a cost saving for the various depots.
Case Study | Local Government | Municipality | COCT | Corrosion Maintenance Time Study
More content
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Shell | Facilities Management Centre
Continuous verification of the efficacy of energy saving programs based on benchmarks.
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
Client Reference | Distributed Facilities Retail | Value Add and Cost Savings
We would like to see savings on our maintenance bill as well as fewer product…
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Case Study | Oil and Gas Retail | Shell | Work Manager Application
The Work Manager app has significantly increased data quality, and velocity as data is entered…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…