Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Reference story | Water utility | SAP® PM optimisation
More content
Case Study | Mining | Manganese | Embedded Email Reports
MMC noticed that their personnel use their mobile phones extensively to access their daily reports.…
Case Study | Mining and Minerals | Petra Diamonds | Centralising Asset Tree using a Placeholder Import in On Key
Petra Diamonds is a leading independent diamond producer with one of the worlds largest diamonds…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Case Study | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Client Reference | Engineering Services | Client Support Dashboard and Notification
Our client develops, maintains and monitors integrations between various source systems on behalf of their…
Client Reference | Oil and Gas | Natural Gas Reticulation | Boiler Reliability Assessment and Maintenance Plans
Our client identified a problem with reduced operational availability of gas-fired boilers at several provincial…
Client Reference | Mining | Coal | Customisation of Asset Tactics
The outputs of the customisation process included a more accurate budget on renewals or the…
Reference story | Municipality | Asset Care Plans on SAP® PM
ACP’s are being identified and implemented in accordance to the asset management strategy.
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…