Shift towards optimal mix of reactive to proactive planned maintenance.
Reference story | Municipal | AM Maturity Assessment
More content
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Case Study | Manufacturing FoodBev | C&D Foods | OK Implementation
Pragma allows analysis of maintenance spends per asset, real-time inventory management and fast reporting capability.…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Case Study | Power | Renewable Energy | Globeleq | Consulting
The AM framework and associated products are providing GSAMS, as a young business in a…
Client Reference | Manufacturing | Real-time condition based monitoring using IIoT
The real-time condition monitoring project brought health measures of critical assets within the client’s plant…
Client Reference | Distributed Facilities | Postal Services | AMIP Assessment
The client is a premier provider of postal and parcel services in the Netherlands. They…
Case Study | Distribution Facilities | Retail | Pepkor
50% decrease in turn around time to complete work orders Accurate and up to date…
Case Study | Local Government | Breede Valley Municipality | Integrated CMMS and Systems
BreedeValley Municipality is a local municipality located within the Cape Winelands District Municipality. The Electro-Technical…