The costing model will result in a 28.5% reduction in travel cost and an overall saving of 5.4% on our maintenance bill.
Reference story | Retail | Costing Model
More content
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Client Reference | Manufacturing | Automotive | Implementing the Pragma Way
At our company our goal is to align people’s ambitions to plant strategy, ensuring that…
Client Reference | Engineering Services | Client Support Dashboard and Notification
Our client develops, maintains and monitors integrations between various source systems on behalf of their…
Reference story | Health Care | Downtime reduction
Inspection preventive maintenance compliance as per legal and safety standards.
Case Study | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Client Reference | Oil and Gas | Natural Gas Reticulation | Boiler Reliability Assessment and Maintenance Plans
Our client identified a problem with reduced operational availability of gas-fired boilers at several provincial…
Client Reference | Facilities in Retail | Reducing Compressor Failures | Condenser fan services and voltage protectors
Our client is a large supermarket retailer in Africa with 35 million customers shopping at…
Municipal | Integrating CMMS and municipal systems
On Key has assisted us to manage our daily operations effectively and also to enhance…
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
Our client is a leading automotive manufacturer in South Africa. The client embarked on a…
Case Study | Distribution Facilities | Retail | Pepkor
50% decrease in turn around time to complete work orders Accurate and up to date…