The costing model will result in a 28.5% reduction in travel cost and an overall saving of 5.4% on our maintenance bill.
Reference story | Retail | Costing Model
More content
Client Reference | Oil and Gas Petrochemical Plant | Equipment Maintenance Strategies
Pragma facilitated the successful development of equipment maintenance strategies and tactics, helped convert them into…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…
Client Reference | Distributed Facilities | Value Add in Gauteng Retail Outlets
The client is one of the largest retailers on the African continent. They have an…
Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment
By doing proper analysis of all EC Tools per station it could be determined which…
Client Reference | Mining Coal | FI on Pump Maintenance Strategy
Having control over planned and calculated (predictable) replacements of your assets will reduce lost production…
Case Study | Oil and Gas | Fuels Retail | Permit To Work Blended Training
The fuels retail sector has a standard health and safety work process for all employees…
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Client Reference | Manufacturing | Automotive | Focused Improvement
The process we followed was excellent. It helped us identify problems and potential root causes…
Case Study | Oil and Gas Retail | Shell | Passport Training
Shell is well known as one of the major national suppliers of petroleum products. Shell…
Client Reference | Distributed Facilities | Retail | Contract and Contractor Management | On Key
Improving contractor control and rates could result in a potential saving of more than 10%…
