With the aid of On Key and the Focused Improvement business process, it assisted us in decreasing the downtime at the headliners section.
Automotive | Improved uptime
More content
Client Reference | Distributed Facilities Retail | Value Add and Cost Savings
We would like to see savings on our maintenance bill as well as fewer product…
Case Study | Mining and Minerals | Coal | Exxaro | Operations Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Oil and Gas | Natural Gas Reticulation | Boiler Reliability Assessment and Maintenance Plans
Our client identified a problem with reduced operational availability of gas-fired boilers at several provincial…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Client Reference | Manufacturing | Automotive | Reduction in Rear Axle Area Downtime
Our client has better control over breakdowns and appropriate escalation processes is in place in…
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Client Reference | Local Government | Metropolitan Municipality | Fleet Management | Optimisting Fuel Consumption
The Pragma Asset Care Centre and the client’s management team focused on and developed areas…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…