The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the assembly process, equipment and risks associated with it.
Reference story | Automotive | Downtime reduction
More content
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Client Reference | Manufacturing | Glass | Improvement of Asset Care Plan
Our client is a leading manufacturer and supplier of float glass, laminated glass and mirrors…
Shell | Facilities Management Centre
Continuous verification of the efficacy of energy saving programs based on benchmarks.
Quarries | EAM system optimisation
PPC’s and Pragma Africa’s new partnership promises to take Strategy Management and Asset Care to…
Case Study | Facilities | Life Healthcare | On Key
On Key has been implemented at more than 50 Life Healthcare hospitals across South Africa…
Case Study | Manufacturing Food and Beverage | Parmalat | CM Leak Detection
Energy costs are monitored by Parmalat management on a monthly basis. The ratios of compressed…
Case Study | Local Government | Metropolitan Municipality | Work Planning and Control on SAP Mobile App
Work Planning and Control managed by the Asset Care Centre (ACC) at a local municipality…
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…