The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were instantly measurable to test the value-add of the maintenance plan.
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
More content
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
Reference story | Health Care | Downtime reduction
Inspection preventive maintenance compliance as per legal and safety standards.
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Case Study | Local Government | Municipality | COCT | Corrosion Maintenance Time Study
Pragma’s intervention has led to an increase in the number of units completed per day…
Client Reference | Manufacturing | Automotive | Focused Improvement
The process we followed was excellent. It helped us identify problems and potential root causes…
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
The reticulation network at a local municipality has more than 600 pump stations across the…
Case Study | Manufacturing | Packaging | Equipment Register Review and Criticality Analysis
Nampak is Africa’s largest diversified packaging manufacturer and has been listed on the JSE Limited…
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Client Reference | Facilities | Commercial Property | Pragma Service Request App
On Key Action provided a service request app that did away with system complexities and…
Client Reference | Mining | Coal | Continuous Miner Utilisation
Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well…